The engineering scope included the design of new pump foundation, monorail, piping, and modifications to the Hot Water Storage Tank per API 650.
Rally performed a complete 3D laser scan of the area that allowed stakeholders to review options for pump location and pipe routings. Piping arrangements were optimized for selected location, advanced installation, equipment constraints, pipe stress, and instrument and valve access.
Download PDF